How to Compare Shutter Cabinet Quotations from Factories in Different Countries
Two quotes for the same slatted-door cabinet can differ widely because the scope behind them differs. This guide shows how to put offers from different countries on the same footing before you decide.
To compare shutter cabinet quotations fairly, you need to convert every offer into the same scope, the same delivery point and the same specification before you look at the total. A lower figure from one factory often means that something is missing, not that the factory is more efficient. This article gives you a practical method for normalising offers for louvred and tambour units, so that the comparison reflects what you will actually receive on site.
Why quotes for the same cabinet rarely match
Slatted-door units have more variables than a standard hinged cabinet: slat profile, slat size, mechanism, track material, finish system and the carcass behind the door. A drawing that looks complete to a designer can still leave several of these open. Each factory fills the gaps with its own assumptions, and the assumptions drive the price.
Offers from different countries add further differences: local material grades, packing habits, what is considered standard for a quotation and which shipping term is used as the default. This is why a furniture quote comparison based on the bottom line alone is unreliable.
Step 1: Build a common comparison sheet
Before the offers arrive, prepare a single sheet with fixed rows. Then transfer each quotation into it line by line. Where a quote is silent, mark the cell as "not stated" and ask the factory to confirm, rather than assuming.
Useful rows include:
- Unit list with model codes, overall dimensions in mm (and inches if your team uses them) and quantities.
- Door type: fixed louvre, adjustable louvre or tambour, and the retraction style.
- Slat material, width, thickness and profile.
- Mechanism and track: material, cord or guide system, any soft-close or stop.
- Carcass board, thickness, edging and interior fit-out.
- Finish system and colour reference (RAL, NCS or a physical sample).
- Hardware brand or approved equivalent.
- Fire-retardant or emission requirements, if the destination needs them.
- Packing method, labelling and container loading.
- Shipping term, named place and who pays each leg.
- Installation, spare parts and documents included.
- Validity period, currency and payment terms.
Step 2: Check that the specification really matches
Start with the items that change cost most and are least visible in a rendering. Slat material is the first: solid timber, veneered MDF, PVC and laminated slats behave differently and are priced differently. The substrate under a veneer matters as much as the veneer itself.
The second is the mechanism. A tambour door can be built with slats on a flexible backing or as linked slats, and tracks can be aluminium, steel or polymer. Two quotes may both say "roller shutter" while describing different constructions. Ask each factory to name the track material, the guide type and the intended duty cycle.
Finish and colour
A finish line that reads "lacquer" can mean very different coating systems and numbers of coats. Request the finish build-up and, if colour accuracy matters, a signed sample. Without it, you cannot tell whether a price difference reflects the coating or only the wording.
Carcass and interior
The door is the visible part, but the carcass often makes up a large share of the cost. Compare board type, thickness, edge treatment, back panel and whether shelves, rails or drawers are included. A quote for doors only is not comparable to a quote for complete units.
Step 3: Normalise the delivery point and shipping term
Price scope shifts a great deal with the Incoterm. An EXW offer excludes export clearance, loading and freight; an FOB offer covers delivery to the vessel at the named port; a CIF or DAP offer goes further. Never compare an EXW figure with a DAP figure.
To normalise, either ask every factory to quote on the same term and named place, or add estimated costs to the lower-scope offers. For the second route, use freight forwarder estimates for your own destination rather than the factory's assumptions, and note that these remain estimates until the booking is made.
| Cost element | EXW | FOB | CIF | DAP |
|---|---|---|---|---|
| Factory packing | Usually included | Included | Included | Included |
| Export clearance and loading | Buyer | Seller | Seller | Seller |
| Main freight | Buyer | Buyer | Seller | Seller |
| Import duties and taxes | Buyer | Buyer | Buyer | Buyer |
| Delivery to site | Buyer | Buyer | Buyer | Seller |
Check the exact Incoterms edition and obligations with your forwarder, because details such as insurance cover and unloading can differ between offers.
Step 4: Compare packing as a real line item
Slats, cords and tracks are vulnerable in transit, so packing is not a minor detail. One factory may price corner protectors, film, foam and export crates; another may assume simple carton packing. The difference can appear as a lower unit price that later turns into damaged goods and replacement delays.
Ask each supplier to state:
- How slats are held in place during transport.
- Whether units are packed assembled or knock-down.
- Labelling by room type and floor.
- Expected carton or crate volume, which affects how many units load into a container.
A factory that quotes better packing will often show a higher figure on paper, but it also lowers the risk of claims and rework at the hotel.
Step 5: Look for what each offer leaves out
Omissions are where quotations diverge most. Go through the list below and mark each item as included, excluded or unclear:
- Shop drawings and approval cycles.
- A mock-up unit or sample before mass production.
- Spare slats, cords and fixings.
- On-site installation or supervision.
- Test reports or material documents the destination requires.
- Any after-sales support for overseas projects.
Each item can be added later, but it should be added to the comparison so that the figures stay honest.
Step 6: Account for currency, validity and payment terms
Offers in different currencies need a clear conversion date. Raw material costs and exchange rates move, so note how long each price stays valid and what happens if an order is placed after that date. Payment milestones also affect your cash flow even when totals look similar, so include them in the sheet.
Reading the result
Once everything is on the same basis, differences usually fall into three groups: real cost differences (materials, labour, efficiency), scope differences (what is and is not included) and risk differences (packing quality, documentation, support). Only the first group is a genuine price advantage.
Where a gap remains large, ask both factories to explain it line by line. A professional supplier can walk you through its assumptions, and the conversation itself tells you a lot about how the project will be managed.
Practical tips for a cleaner process
- Send the same drawing set and the same specification sheet to every factory.
- Ask for quotes on one Incoterm and one named place.
- Request a sample of the slat, finish and mechanism before comparing totals.
- Keep all clarifications in writing and update the sheet when answers arrive.
- Do not choose on unit price alone; weigh lead time, packing and support alongside it.
Next step
If you would like an offer that is easy to compare, send us your drawings or unit list. We will review the specification, state the scope and packing clearly, and quote on the shipping term you prefer for delivery to your country.
Sıkça Sorulan Sorular
Why do two shutter cabinet quotations differ so much?
Usually because the scope is not identical. Slat material, mechanism type, finish system, carcass construction, packing and shipping term can all vary between offers. Until you align these points on one comparison sheet, the totals describe different products and services.
Which Incoterm is best for comparing offers?
Ask every factory to quote on the same term and named place, for example FOB or DAP. The best choice depends on whether you have your own freight forwarder. What matters most is consistency, so that every offer covers the same responsibilities.
Should I ask for samples before comparing prices?
Yes, where possible. A slat sample, finish sample and mechanism sample show the real build quality behind the wording in a quote. They help you judge whether a price difference reflects materials and workmanship or only a different description.
How do I compare quotes in different currencies?
Convert them to one currency on a stated date and record each offer's validity period. Because exchange rates and material costs can change, ask what happens if you order after the validity date and keep the conversion method the same for all offers.
Is packing really worth comparing?
Yes. Slatted doors, cords and tracks can be damaged in transit if packing is light. Ask how slats are secured, whether units ship assembled or knock-down, and how cartons are labelled. Better packing reduces the risk of claims and delays at the site.
What should I do if a quote is much lower than the others?
Ask the factory to confirm the scope line by line. Check slat material, mechanism, carcass, finish, packing, shipping term and included documents. A large gap often comes from an exclusion or a different specification, so clarify before drawing conclusions.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.