How to Order Custom Doors from a Turkish Factory: Drawings, Samples and Export Steps
A practical walkthrough of the ordering path for custom doors from Turkey, from the first door schedule to loading the container. Learn what to send, what to approve and what to agree before production starts.
Ordering custom doors from Turkey is a straightforward process when you know the sequence: door schedule, drawings, sample approval, production, packing and shipping. Each step has a clear output, and most delays come from missing information at the start rather than from the factory floor. This guide follows the path an overseas buyer takes, so you can prepare the right documents and avoid surprises.
Why buyers source custom doors from Turkey
Turkey has a long tradition of woodworking and a mature supply chain for boards, veneers, lacquers and hardware. A Turkish door manufacturer can typically handle made-to-drawing projects, not only catalogue models, which suits hotels, residential developments and fit-out contractors with specific designs.
Location also matters. Shipping routes from Istanbul reach Europe, the Middle East, Central Asia and Africa, and many other regions by sea container. At Palmiye, our door factory in Istanbul produces to project drawings, so the buyer's design intent stays at the centre of the order.
Step 1: Build a door schedule
The door schedule is the foundation of your enquiry. It lists every opening so the factory can price and plan accurately. Without it, quotations are estimates built on assumptions.
For each door type, include:
- Door reference or type code and quantity
- Leaf width, height and thickness in millimetres (inches in brackets if your drawings use imperial)
- Handing (left or right) and swing direction
- Core type and surface finish
- Fire, acoustic or moisture requirements, if any
- Frame or lining type and wall thickness
- Hardware preparation: hinges, lock case, closer, peephole, electronic lock
If you only have a room layout and no schedule yet, send that. We can help you count openings and group them into types, which also reveals where you can standardise sizes to keep cost under control.
Step 2: Share drawings and specifications
Drawings turn a list into a buildable product. The most useful set includes:
- Door elevations showing panel layout, grooves, glazing or inlays
- Sections through the leaf, frame and threshold
- Hardware positions, such as hinge heights and lock centre height
- Finish references, for example RAL codes, veneer species or sample photos
- Applicable standards or tender clauses
Our team reviews these and prepares shop drawings where needed. This is the stage to raise questions about tolerances, frame fixing and how the doors meet floors and walls. A short clarification call here saves several email rounds later.
Step 3: Receive a quotation you can compare
A useful quotation states what is included and what is not. Check that it covers the door leaf, frame or lining, finish, hardware preparation or supply, packing and the agreed trade term. The Incoterm matters: EXW, FOB, CIF and DAP divide cost and responsibility differently between factory and buyer.
Pricing depends on the project. Core material, finish, size, quantity, fire or acoustic requirements and hardware all influence it, so we do not quote from a single number. When you compare offers, line them up item by item, not only by total.
Questions to ask every supplier
- Are frames and architraves included?
- Who supplies the hardware, and who prepares the leaf for it?
- Is installation part of the offer or separate?
- Which test reports or declarations can be provided for the requested performance?
Step 4: Approve samples or a prototype
Before mass production, approve a sample. For a new design, this may be a prototype door; for standard models, it may be finish samples or a sample board. The sample confirms proportions, grain, colour, sheen, edge detail and hardware fit.
View it under the lighting of the real space if possible, because colour can look different on site than on a workshop bench. Record decisions in writing, ideally on a sign-off sheet that lists finish, dimensions, hardware and any changes requested. Once approved, this sample becomes the reference for the whole batch.
If shipping a sample by courier, plan for transit and customs time in your schedule. Tell us early so we can include it in the timeline.
Step 5: Confirm the order and production plan
After sample approval, the order is confirmed with final quantities, schedule, payment terms and delivery terms. Payment structure varies by project and is agreed between the parties, usually with a deposit at order and further payments linked to milestones.
Lead time depends on the model, finish, quantity and how quickly approvals are returned. Custom profiled designs and special finishes generally need more time than plain flush doors. Instead of promising a fixed number, we build a production schedule with you, tied to your construction programme and the date you need doors on site.
What happens in production
In general, production moves through board selection and cutting, core assembly, veneering or surface application, edging, machining for hardware, finishing and final inspection. Moisture control and edge sealing are important for stability, particularly for humid climates, so mention the destination conditions in your first enquiry.
Step 6: Inspect before loading
Finished leaves should be checked against the approved sample and the door schedule. A practical inspection covers:
- Dimensions, squareness and flatness
- Finish colour, sheen and surface defects
- Edge quality and sealing
- Hardware routing and cut-outs in the correct positions and handing
- Marking and quantities per type
If you cannot visit in person, a video inspection or a photo report can be arranged. Raising any issue at this stage is far easier than after the doors have crossed the sea.
Step 7: Packing, marking and loading
Export packing protects leaves, frames and edges through handling, port stops and long transit. Typical measures include protective film, edge and corner guards, wrapping and crating or palletising for stacking stability. Each package is marked with the door type or room reference so that installers can sort the delivery quickly.
If the project proceeds floor by floor, you can ask for shipping in sequence, so that doors for the first floors arrive first. Doors can also share a container with other joinery such as wardrobes or panelling, which can make better use of space on mixed-scope projects.
Step 8: Export documents and shipping
A door shipment is normally accompanied by a commercial invoice, packing list and bill of lading or other transport document. Depending on the destination, you may also need a certificate of origin or other documents required by local customs. Check with your freight forwarder or customs broker which papers your country asks for, as requirements differ between markets.
The trade term decides who books the freight and who carries the risk at each stage. With FOB, the buyer arranges the main sea freight; with CIF or DAP, the seller covers more of the journey. Choose the term that matches your logistics experience and your site conditions.
Step 9: Receiving and installation
When the container arrives, check the packages for visible damage before signing, and photograph any issue straight away. Store the doors flat or upright as advised, in a dry, ventilated area, away from wet trades such as plastering and screeding.
Installation can be done by your own contractor, and on-site support can be discussed where it suits the project. Having the hardware ready and the openings measured before the doors arrive keeps the fit-out running smoothly.
Common mistakes to avoid
- Requesting a price without a door schedule
- Changing finish or size after sample approval
- Leaving hardware decisions until late, which delays routing
- Ignoring destination climate when choosing core and finish
- Forgetting to align the delivery date with site readiness
Ready to start?
If you are planning a door package, send us your door schedule, drawings or even a rough list of openings. We will review them, suggest suitable materials and finishes, and come back with a quotation and a realistic production and shipping plan for your project.
Sıkça Sorulan Sorular
What do I need to send to get a quotation for custom doors?
Send a door schedule with quantities and sizes, plus drawings or reference images showing the design. Add finish preferences, hardware details, performance needs such as fire or acoustic ratings, the destination country and your preferred trade term. The more complete the information, the more accurate the quotation will be.
Can I approve a sample before placing the full order?
Yes. For custom designs we normally recommend approving a prototype door or finish samples first. This confirms proportions, colour, grain and hardware fit. The approved sample then serves as the reference for the whole production batch.
How long does it take to produce and ship custom doors?
It depends on the model, finish, quantity and how fast approvals are returned. Plain flush doors usually take less time than profiled or specially finished designs. We agree a schedule with you after reviewing the drawings, linked to your site programme and shipping route.
Which shipping terms can I choose for export doors?
Common options are EXW, FOB, CIF and DAP. They differ in who arranges freight and who carries risk at each stage. We can quote on the term that suits your logistics, and your freight forwarder can advise on what works best for your destination.
Can you supply doors together with frames and hardware preparation?
Yes, doors can be supplied with frames or linings, and leaves can be machined for hinges, locks, closers and electronic lock preparation. Send your hardware specification early so the routing and cut-outs match your chosen supplier's products.
Do you export to countries outside Europe and the Middle East?
We work with buyers worldwide. Destination affects packing, documents, climate-related material choices and freight options, so tell us where the project is located. We can then advise on a suitable specification and shipping plan.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.




