Shutter Cabinet Order Checklist for Interior Designers: Decisions to Lock Before Sending Drawings

A practical shutter cabinet designer checklist for hotel projects. Learn which decisions to freeze before you send drawings to a factory, and why late changes cost the most.

A shutter cabinet designer checklist helps you decide which choices must be final before drawings reach a factory. Slatted and tambour units depend on a handful of linked decisions: slat profile, mechanism, finish and clearances. Change one of them late, and the others often have to be redrawn. This guide sets out what to freeze, in what order, and what can safely stay open.

Why a design freeze matters more for shutter cabinets

A hinged door is largely a flat panel with hardware. A shutter-style door is a small assembly of many slats, a track or guide system and a retraction space inside the carcass. Altering the slat width, for example, changes the door weight, the roll-up radius and sometimes the depth the cabinet needs.

This is why a pre-order design freeze is useful for any interior designer working with slatted cabinets. It gives the factory a stable basis for a quotation, shop drawings and a mock-up room. It also protects your schedule, because each revision after approval can restart sample making and drawing checks.

Step 1: Confirm the door type and opening style

Start with the biggest decision, because everything else follows from it. Be clear about which of these you are specifying:

  • Fixed louvre: angled slats set in a frame, used for ventilation and a classic look.
  • Adjustable louvre: slats that tilt, which adds moving parts and a control rod.
  • Tambour or roller shutter: flexible slats that retract into the carcass, either vertically or sideways.

Also state the direction of retraction. A vertical roll-up needs space above or behind the opening, while a horizontal slide needs a side pocket or curved track. Do not leave this to be decided at drawing stage, since it changes the internal layout.

Step 2: Fix the cabinet dimensions and tolerances

Give final overall sizes, not approximate ones. For each cabinet type, state width, height, depth and the opening size if it differs from the carcass. Metric dimensions first, with imperial in brackets if your client uses them, for example 600 mm (23.6 in).

Check the following before you freeze:

  • Maximum door height and width you actually need, since very tall or wide slatted doors may need a different construction.
  • Room tolerances such as uneven walls, floor levels and ceiling heights.
  • Gaps to adjacent joinery, so slats do not clash with neighbouring doors, trim or skirting.

If the cabinet sits between walls, tell the factory whether it will be built to site measurements or to the drawing. This single note avoids many fitting problems.

Step 3: Lock the slat profile, width and spacing

Slat proportions define how the cabinet looks, so decide them once. Flat, rounded and grooved profiles each read differently in the room. Width and gap affect visibility into the cabinet, airflow and cleaning effort.

When freezing this, record:

  • Slat width and thickness
  • Pitch or gap between slats (for louvres)
  • Profile shape and edge detail
  • Whether the slat pattern needs to align across neighbouring units

If several cabinets sit side by side in a wardrobe run, ask for the slat lines to be aligned. That needs to be in the drawing brief from the start, not added after the first sample.

Step 4: Choose materials and finishes with substrates in mind

Name the slat material, the carcass material and the finish for each. Solid timber, MDF, veneered board and PVC each behave differently in humid, dry or high-use settings. The hotel's location and cleaning routine should guide the choice, not only the mood board.

Finish decisions to confirm:

  • Lacquer, veneer, laminate or painted slats
  • Colour reference, such as a RAL or NCS code, or a physical sample approved by the client
  • Sheen level, because gloss and matt look different on a slatted surface
  • Grain direction and matching with other joinery in the room

Natural timber varies from piece to piece. If your client expects an exact match to a photo, say so early and agree what variation is acceptable.

Step 5: Specify the mechanism and hardware

For tambour and adjustable units, the mechanism is the part guests touch every day. Describe what you expect rather than leaving it open: track material, handle type, soft-close or end stops, and whether the door should lock.

Points to settle:

  • Handle style: recessed, edge or finger grip, and its position for easy reach
  • Lock or no lock, especially for minibars and housekeeping stores
  • Any approved hardware brand, and whether equivalents are acceptable
  • Noise expectations, since rattling slats are noticed at night

If your brief names a hardware brand, state whether a technically equal substitute may be proposed. This keeps the factory from guessing and helps avoid delays if a component is out of stock.

Step 6: Decide the interior fit-out

The inside of a slatted cabinet is easy to forget because the focus is on the door. Yet shelves, rails, drawers and lining affect the carcass design and the retraction space.

  • Number and height of shelves, fixed or adjustable
  • Hanging rails and their clearance behind the door
  • Drawers, and whether they must clear the retracted shutter
  • Lining material, such as felt or laminate

Check these against the roll-up space. A drawer that collides with a retracted slat set is a typical late discovery.

Step 7: Settle services, appliances and ventilation

If the cabinet holds a television, minibar, coffee machine or other equipment, the services need to be shown on the drawing. Appliances produce heat or steam, and slats may need to stay open or the unit may need extra airflow.

Provide the following where relevant:

  • Appliance models and dimensions, or at least the maximum size
  • Socket and cable positions, and cable routing holes
  • Ventilation openings or louvred sections
  • Lighting, such as LED strips, and how it is powered

Where a product's exact model is not yet known, give a maximum envelope and mark it as provisional, rather than leaving the space undefined.

Step 8: Think about safety, fire and compliance

Requirements differ by country and by hotel brand, so confirm them before drawings are sent. Fire-retardant boards or coatings, emission classes for boards and glues, and safety requirements such as pinch protection can all influence material choice and cost.

Ask your client or consultant which standards apply and pass them to the factory in writing. If the hotel has family suites or accessible rooms, add reach range and one-hand operation to the brief.

Step 9: Agree the approval route and mock-up

A design freeze works only if everyone agrees how approval happens. Decide who signs off samples, how many sample rounds are expected and whether a mock-up room will be built before mass production.

For overseas projects, remote approval by photos and video is common. Agree what the factory should show, such as the slat operation, finish close-ups and the cabinet in its mock-up setting.

Step 10: Set logistics assumptions

Shipping affects design more than many designers expect. Long slatted doors, finish protection and packing method can influence how units are built and delivered. State the destination country, the intended Incoterm such as EXW, FOB, CIF or DAP, and whether on-site installation is needed.

Timing depends on the size of the order, the finish and the approval process, so we do not quote a standard figure here. Linking the production schedule to your site programme is the safer approach.

A quick table for the design freeze meeting

Decision areaLock before drawingsCan stay open briefly
Door type and retractionYesNo
Overall dimensionsYesMinor tolerances only
Slat profile and spacingYesNo
Material and finishYesExact colour, until sample approval
Mechanism and hardwareType and functionBrand equivalents
Interior fit-outLayoutLining colour
Appliance and cable detailsEnvelope sizesFinal model numbers
Shipping termsDestination and IncotermContainer plan

Common causes of late changes

Most revisions come from a short list of causes. Knowing them helps you ask the right questions before the freeze.

  • The client changes the finish after seeing a render in a different light.
  • An appliance is replaced by a larger model.
  • Fire or emission requirements are confirmed after materials are chosen.
  • Adjacent joinery changes and the slat lines no longer align.
  • The mock-up reveals that reach or handle position is uncomfortable.

Next step

If you are preparing a hotel project with slatted or tambour cabinets, send us your drawings or room schedule, even at draft stage. We will review them against this checklist, point out open decisions and advise what the factory needs for an accurate project quotation. We supply projects worldwide from our factory in Istanbul.

Sıkça Sorulan Sorular

What should an interior designer decide before sending shutter cabinet drawings?

Lock the door type, retraction direction, overall dimensions, slat profile and spacing, material and finish, mechanism and handle type, interior fit-out, appliance and cable details, and the destination with its shipping terms. These choices affect each other, so changing one later often means redrawing others.

Can finish colours be confirmed after the quotation?

Often yes, as long as the finish type is fixed. The quote can be based on lacquer, veneer or laminate, with the exact colour approved on a physical sample later. Changing the finish type itself usually affects price and lead time, so decide that first.

Do I need a mock-up room for slatted cabinets?

It is strongly advisable for projects with many rooms. A mock-up lets you test slat operation, handle position, noise, finish and clearances in a real setting. Fixing a problem at this stage costs far less than correcting finished production.

What information does a factory need to quote a shutter cabinet?

Provide drawings with dimensions, door type, slat details, materials, finish references, hardware expectations, interior layout, quantities per room type, destination country and preferred Incoterm. Provisional details are acceptable if clearly marked, so the factory can price them realistically.

Should I specify a hardware brand or allow equivalents?

State your preference and say whether technically equal substitutes are acceptable. Naming a brand without that note can cause delays if a component is unavailable. Equivalents should be approved against agreed performance, not only price.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.