Customer Scenario: Supplying Shutter-Door Storage Units for a 90-Room Resort Overseas
A illustrative scenario of a shutter door storage resort project, showing how drawings, sampling, production and export shipping can be organised for a 90-room resort. It is a planning example, not a record of a named client.
A shutter door storage resort project involves more than ordering slatted cabinets from a drawing. It is a chain of decisions on design, sampling, production, packing and delivery, and each stage affects the next. This article follows an illustrative scenario of a 90-room resort overseas to show how we would organise that chain at Palmiye.
Please note: this is a composite planning scenario, not a report on a named client. Quantities, room types and timings are examples. Real schedules depend on the project, the materials chosen and the approval process.
The scenario: a 90-room resort and its storage brief
Imagine a developer building a coastal resort with 90 keys. The interior designer wants slatted storage that feels light and natural, and the operator wants units that housekeeping can clean quickly and that survive years of daily use. The resort is overseas, so everything has to be planned around shipping and a construction programme that the factory does not control.
The brief in this example covers three kinds of shutter-door storage:
- Minibar and coffee niches: tambour-door units that hide appliances in every room.
- Wardrobe sections: louvred or slatted fronts that add airflow in a humid climate.
- Luggage and safe alcoves: a smaller number of fixed-louvre fronts in suites.
Splitting the brief into item types is the first useful step. It tells the factory which mechanisms, slat profiles and carcass sizes are involved, and it shows where standardisation can reduce complexity.
Step 1: Turning design intent into a room schedule
A project like this starts with a room schedule, not a price request. The schedule lists each room type, the number of rooms, and every storage unit in each room with approximate width, height and depth. From this we can count how many unit types exist and how many repeat.
In a 90-room resort, the designer might use three or four room types. If the minibar niche has the same internal size in all of them, one mechanism specification can serve the whole project. Fewer variants mean fewer drawings to approve, fewer sample sets and a simpler packing list.
Questions raised at this stage
- Are the units built into wall niches or freestanding against a wall?
- What appliances sit behind the doors, and how much heat or steam do they give off?
- Which finish does the design team want: natural veneer, lacquer or laminate?
- What fire or emissions requirements apply in the destination country?
None of these questions is unusual, but answering them before drawing starts prevents rework later.
Step 2: Shop drawings and technical clarification
Once the schedule is agreed, the factory prepares shop drawings. For slatted units these must show more than outside dimensions. They should define slat width and thickness, the track or guide system, the housing space above or beside the door, the clearance for door travel, and the interior fit-out.
The drawings in our scenario go through a few rounds with the designer. Typical comments include moving a socket position so it does not clash with the tambour housing, and adjusting a niche depth so a coffee machine can be pulled out without hitting the door. These are small changes on paper and expensive ones on site, which is why drawing review is worth the time.
If you work in imperial units, the drawings can carry metric dimensions with imperial equivalents, for example 600 mm (23.6 in), so both site teams and designers read the same figures.
Step 3: Sampling and the mock-up room
Before mass production, the buyer approves samples. For shutter-door units, a sample should let you judge four things:
- Slat finish and colour against the approved design sample.
- Door movement: smoothness, noise and the way the door stops at the end of travel.
- Construction details: edges, slat joints, handle position and interior lining.
- Fit with neighbouring joinery, especially where grain and colour must match wardrobes or panelling.
Sıkça Sorulan Sorular
Is this an actual client case study?
No. It is an illustrative planning scenario built from typical hotel export projects. Quantities, room types and timings are examples. Real project schedules depend on drawings, materials, approvals and shipping terms, which we confirm with each buyer in a quotation.
What do you need to quote a shutter-door storage project?
Send a room schedule, drawings or sketches, target dimensions, preferred finishes and the destination country. Information on appliances behind the doors, fire requirements and the construction programme also helps us propose suitable mechanisms and a realistic production plan.
Do you supply a mock-up room before mass production?
Yes, we recommend approving samples or a mock-up unit before production starts. It lets designers, owners and operators check finish, slat operation and fit while changes are still inexpensive. The scope of the sample is agreed per project.
Can you ship shutter-door units to any country?
We export worldwide from our Istanbul factory. The route, packing method and Incoterm, such as FOB, CIF or DAP, depend on the destination and the buyer's preference. Customs requirements in the destination country should be checked early.
Do you offer installation on site?
On-site installation support can be arranged depending on the project and location. Please mention whether you need installation in your enquiry so we can include it in the scope and plan it with your fit-out contractor.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.