Shutter Cabinet Specification Sheet for Hotel Buyers: Fields to Complete Before Requesting a Quote
A shutter cabinet specification sheet turns a vague enquiry into a quotable brief. Use these fields to get faster, comparable quotations from any factory.
A shutter cabinet specification sheet is a single document that lists everything a factory needs to price and build your slatted or tambour units: dimensions, door type, materials, finish, quantities and delivery terms. When you complete it before contacting suppliers, quotes arrive faster and you can compare them line by line. This article gives you a field-by-field template you can copy into your own RFQ.
It is written for procurement managers, designers and contractors who send enquiries to several manufacturers at once. The same structure works as a cabinet RFQ template and as a technical data sheet for joinery that stays with the project file.
Why a specification sheet speeds up quotations
Most delays in a hotel furniture quote request come from missing information, not from pricing work. The factory writes back with questions, you answer a few of them, and a week is gone. A complete sheet removes that loop.
It also protects you at comparison stage. If three suppliers quote against the same fields, differences in price are easier to trace to real differences in scope, such as slat material, packing or installation.
Section 1: Project and contact details
Start with the basics so the factory can judge scale, timing and destination.
- Project name and type: new build, renovation, serviced apartments, resort villas.
- Hotel category or brand standard: include brand standards if the operator issues them.
- Destination country and city or port: this affects climate advice, packing and freight.
- Target quotation date and decision date: so the factory knows how much time it has.
- Target delivery window: link it to your construction programme rather than a fixed date alone.
- Contact roles: who approves technical points and who handles commercial terms.
Section 2: Unit schedule and quantities
List each cabinet type as a separate line with a reference code. A clear code system, such as SC-01 for a wardrobe and SC-02 for a minibar unit, keeps drawings, quotes and packing lists aligned.
| Field | What to enter | Example format |
|---|---|---|
| Unit code | Your own reference | SC-01 |
| Location | Room type or area | King room, minibar niche |
| Quantity | Units per room type and total | Per room and total |
| Overall size | Width x height x depth in mm (in) | 900 x 1800 x 450 mm (35.4 x 70.9 x 17.7 in) |
| Opening size | Clear door opening, if different | As above |
| Handing or layout | Left, right, mirrored rooms | Mirrored pairs |
If room layouts are mirrored, say so. It changes how units are labelled and packed, even when the cabinets themselves are identical.
Section 3: Door type and mechanism
This is the section that most often decides whether quotes can be compared. State the door style you want, or ask for options if you are still choosing.
Door style
- Fixed louvred hinged door
- Adjustable louvred door
- Tambour roller shutter, vertical roll-up
- Tambour with horizontal slide or side-fold retraction
Slat and mechanism details
- Slat material: solid timber, MDF, veneered or another material.
- Slat width and spacing or pitch: in mm, or a reference sample.
- Slat profile: flat, rounded or grooved.
- Track material: aluminium, steel or polymer, if you have a preference.
- Operation: manual with handle, soft-close or damper requirements, lock requirement.
- Expected use: guest room daily use, back-of-house, or occasional storage.
If you do not know these details yet, write "supplier to propose" and ask for the proposal to be priced as a separate option. That keeps the base quote clean.
Section 4: Carcass and interior fit-out
The visible slats are only part of the unit. Specify what sits behind them so the quote covers the full cabinet.
- Carcass board type and thickness, and any emission class requirement.
- Shelves, hanging rails, drawers or electrical provisions inside.
- Interior lining: laminate, veneer, felt or fabric.
- Ventilation needs for appliances or electronics, with approximate heat sources.
- Back panel and wall fixing method, with wall type (concrete, drywall or masonry) if known.
Section 5: Finish and colour
Finish is a frequent source of price differences, so be specific. Name the finish system and the colour reference, and attach a physical or digital sample where possible.
- Finish type: lacquer, veneer with clear coat, laminate or painted slats.
- Colour reference: RAL, NCS or a sample you will send.
- Gloss level and grain direction.
- Need to match other joinery, such as wardrobes or wall panels, and by which sample.
- Exposure conditions: window light, coastal air, high humidity or dry heating.
Natural timber varies in tone and grain. If you need close matching across rooms, say how much variation is acceptable and who approves it.
Section 6: Compliance and testing requirements
List only what your project truly requires, and attach the relevant clauses from the tender or brand standard. Do not assume a factory holds a particular certificate; ask for it to be confirmed.
- Fire or low-flame requirements for boards, finishes and fabrics in the destination country.
- Emission or indoor air quality requirements.
- Cycle, load or finish tests you want reported for the mechanism.
- Safety points, such as pinch protection where children will use the units.
- Documents needed for customs, such as origin or material declarations.
Section 7: Samples, mock-up and approvals
Say how you plan to approve the product. A mock-up room or a pilot unit changes both the schedule and the quotation structure.
- Whether you need a finish sample, a slat sample or a complete mock-up unit.
- Who approves it and how, for example on site, by courier sample or by video.
- Whether production starts only after sign-off.
Section 8: Packing, shipping and installation
Quotes are only comparable if they state the same commercial terms. Give the factory the Incoterm you want priced and the delivery point.
- Incoterm: EXW, FOB, CIF or DAP, with the named port or site.
- Packing: export crates, protective film, corner protection and labelling by room type.
- Loading: full container, shared container or truck delivery.
- Delivery sequence: floor by floor or all at once, and storage available on site.
- Installation: supply only, supervision, or full on-site installation.
- Spare parts: spare slats or cord kits to ship with the first order.
Section 9: Commercial and quotation format
Finally, tell suppliers how you want the quotation presented. Asking for the same layout from everyone saves you rework.
- Price per unit code, plus separate lines for packing, freight and installation.
- Currency and the period for which the price should remain valid.
- Payment terms you expect, such as deposit and milestone structure.
- Lead time stated as production stages from drawing approval, not only one total.
- Warranty and after-sales terms offered.
A compact template you can copy
For small enquiries, a shorter version may be enough. Include at least these fields:
- Project name, country and delivery point
- Unit codes, sizes and quantities
- Door style, slat material and mechanism preference
- Carcass, interior and finish with colour reference
- Compliance requirements
- Sample or mock-up plan
- Incoterm, packing and installation scope
- Quotation format, currency and validity
Attach drawings and keep the sheet current
Add plan, elevation and section drawings wherever you have them, in metric with imperial in brackets if your team uses both. Where drawings are not ready, a sketch with key dimensions is still more useful than a text description alone.
Revise the sheet when the design changes and give it a version number. Quotes then refer to a known revision, which avoids disputes about what was priced.
Next step
If you are preparing a hotel project, send us your drawings or a partly completed sheet. We will review it, tell you which fields are still missing, and come back with a quotation covering materials, lead time and shipping options for your destination.
Sıkça Sorulan Sorular
What should a shutter cabinet specification sheet include?
It should cover project details, a unit schedule with sizes and quantities, door style and mechanism, carcass and interior, finish and colour reference, compliance requirements, sample plan, packing and shipping terms, and the quotation format you expect.
Can I request a quote if I do not know the mechanism yet?
Yes. Write that the supplier should propose a mechanism and ask for it to be priced as a separate option. Give the usage level, such as daily guest use, so the proposal is realistic.
Which drawings should I send with a hotel furniture quote request?
Plan, elevation and section drawings with key dimensions are ideal. If they are not ready, send a dimensioned sketch and a room schedule. State the drawing revision so the quotation refers to the correct version.
Why do quotes from different factories look so different?
Differences often come from scope: slat material, finish system, packing method, installation and Incoterms. Using one specification sheet for every supplier makes these differences visible and easier to compare.
Do I need to choose an Incoterm before requesting a quote?
It helps. Naming EXW, FOB, CIF or DAP with a port or site lets every factory price the same scope. If you are unsure, ask for two options and compare the totals.
Should I ask for a mock-up before ordering?
For larger hotel projects a mock-up or pilot unit is advisable, because it lets you check slat operation, finish and fit before mass production. State it in the sheet so the schedule and quotation include it.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.




